All
  • All
  • Product Management
  • News and Information
  • Introduction content
  • Business outlets
  • Frequently Asked Questions
  • Corporate Video
  • Corporate Portfolio

To animate the Banner

Image Name

Tendering Project for Chemical Products (Sodium Hypochlorite, Sodium Hydroxide, Hydrochloric Acid) – June and July 2021


2021年10月28日 08:00

Name

Last updated time

Size

  • 2023-11-17 11:26:55.486

    18.5KB

1. Procurement Technical Requirements (Substantive requirements and conditions that do not allow deviations are highlighted in bold and italics.)

 

2. The scope of this procurement includes the supply, transportation, installation, maintenance, personnel training, and after-sales services for the goods.

 

3. The procurement budget amount for this project RMB 790,000.00 (¥790,000.00), any final response offering a price higher than the procurement budget or the maximum price limit will be deemed an invalid bid. The maximum price limit for this project is set at 90% of the procurement budget. Unless otherwise specified, all goods procured under this contract must meet standard functionality and technical specifications. Additionally, supplied products must be brand-new, fully compliant, and genuine; manufacturers are required to provide a product warranty certificate. For imported products, relevant certification documents must also be submitted, ensuring full compliance with national environmental protection standards and other applicable quality regulations.

 

4. Goods Quality Requirements

Complies with the requirements of the "Hygiene Standard for Drinking Water" (GB5750-2006). Consumables for online instruments must be compatible with the equipment, and standard samples as well as consumables for online instruments will be supplied on demand, ensuring they remain within their expiration dates. All chemicals and standard samples must also meet the criteria outlined in Jiangsu Province’s Dual-Random Inspection System and the evaluation index system for urban drinking water supply safety assurance assessments in Jiangsu Province. Additionally, all standard samples listed in Tables 1-3 and 1-4, along with environmental standard samples, must adhere to the specifications noted in the remarks section.

The manufacturer of the provided standard solutions must hold a National Standard Substance Certification and a Certificate of Accreditation for Manufacturers of Standard Substances/Standard Samples. Additionally, the transportation of chemical reagents and consumables must comply with relevant national laws, regulations, and industry standards.

 

5. After-sales Service Requirements

(1) The equipment will be covered by a free one-year warranty starting from the date of acceptance. During the warranty period, Party B will provide the "three guarantees" for product quality. Any malfunctions caused by equipment configuration or manufacturing defects must be promptly repaired or replaced free of charge by Party B within 24 hours. All associated costs arising from such issues will be borne by Party B.

(2) Technical support response time: For general issues, phone support will be provided within 2 hours; for complex or critical issues, on-site resolution is guaranteed within 2 days. During the warranty period, all related costs will be borne by Party B. After the warranty expires, Party B will charge only the actual cost incurred.

In addition to the service requirements specified in this document, the supplier shall provide detailed information on any after-sales services it can commit to, and will also be responsible for offering free training to the purchaser’s personnel on equipment maintenance or operation. The repair response time will be the normal travel duration plus an additional 3 hours.

 

6. Delivery Time and Location

(1) To facilitate the purchaser's production planning, the delivery schedule for all goods must be agreed upon through negotiation. If necessary, deliveries will be made in installments. The supplier is required to commit to a reasonable delivery timeline, ensuring that each batch is delivered within two days after both parties have confirmed the order. Any delays in delivery will result in applicable financial penalties.

(2) Delivery Location: The supplier will deliver the goods and unload them at the location specified by the purchaser, ensuring that all relevant documentation (such as certificates of conformity and inspection reports) is provided along with the shipment. The purchaser will arrange for qualified personnel to inspect the goods; any items failing the inspection must be returned, and all resulting losses will be borne by the supplier.

 

7. Payment Methods

After each batch of goods is initially inspected and accepted upon arrival at the site, payment will be made in full within 10 days of use—provided no quality issues are detected during that period.

 

Submit a bidding application